6 min read · 2026-11-11
Generator maintenance checklist: ready before the power goes
What a building team checks and logs on a standby generator, what the contractor must do, how to prepare for a power cut, and replies to residents.
A standby generator is only useful if it starts the moment the power fails, and most fail for dull reasons: low fuel, a flat starter battery, a blocked air intake or a service that slipped. Your building team's part is looking, reading and logging: fuel level, battery and alarms, the room kept clear, and every run written down. Servicing, load tests, fuel system work and the changeover switch belong to the generator contractor and a licensed electrician. Here is the checklist, the log, and what to tell residents during a cut.
What the generator usually powers
Before writing the checklist, know what is on the generator in your building. Common loads are:
- Fire alarm, fire pumps and emergency lighting (often with their own batteries too).
- At least one lift, so people can get down.
- Water booster pumps.
- Car-park and stair lighting, gates and barriers.
- In hotels and clinics: front desk, servers, fridges, some rooms.
Write the list on the wall of the generator room. When the power fails, residents will ask "why does my flat have no power when the lift works?" and you need the answer.
Why generators fail when needed
| Cause | How it shows | Who prevents it |
|---|---|---|
| Starter battery flat | Cranks slowly or not at all | Contractor; you log battery alarms |
| Low or old fuel | Starts, then stops | You read the level; contractor manages fuel quality |
| Blocked air intake or radiator | Overheats in summer | You keep the room and louvres clear |
| Service overdue | Any of the above | You track the date; contractor services |
| Changeover switch fault | Generator runs, building stays dark | Licensed electrician / contractor |
| Left in "manual" or "off" | Never starts | You check the mode every week |
Summer adds heat: a generator room at full load in July needs clear airflow more than at any other time. Book the pre-summer load test with the rest of the plant in the Gulf summer maintenance calendar.
The checklist
Weekly (building team)
- Control panel in "auto" (or whatever mode your contractor says is the standby mode); no alarm lights.
- Fuel level read and written down.
- No leaks of fuel, oil or coolant under the set.
- Room clear: nothing stored, louvres and vents not blocked, door locked.
- Fire extinguisher in the room present and in date.
Monthly
- A test run by the contractor, or by staff they trained, if your contract arranges it: start time, running time, anything unusual, logged.
- Fuel delivered and fuel used, so you know how many hours you have.
- The contractor's visit report filed.
Every few months or by running hours, by the contractor
- Oil, filters and coolant service.
- Battery test and replacement as needed.
- A test on load, including the changeover to generator and back.
Yearly
- Full service and load test.
- Inspection of the fuel tank and lines.
- Any test or record your authority's rules ask for.
Who does what
| Task | Building team | Generator contractor | Licensed electrician |
|---|---|---|---|
| Reading panel, fuel, alarms | Yes | ||
| Keeping the room clear and locked | Yes | ||
| Starting for a test | Only if trained by the contractor | Yes | |
| Oil, filters, batteries, coolant | Yes | ||
| Fuel system and tank work | Yes | ||
| Changeover switch and wiring | With electrician | Yes |
Diesel and exhaust are dangerous in an enclosed room. Nobody runs a generator with the room closed up or uses its fuel for anything else.
What to photograph and log
- The panel and fuel gauge each week, with the date.
- Every run: why (test or power cut), start, stop, hours.
- Each fuel delivery: litres and date.
- The contractor's service reports and the next service date.
In UnitVO, the generator can be a weekly point on building rounds with a photo required, and a Not OK (an alarm light, a leak) becomes a job straight away. The set itself sits in the equipment register with its warranty date and history, and repeat repairs are flagged.
During a power cut: replies residents need
| Resident asks | First reply |
|---|---|
| "There's no power" | "The whole area has a power cut. Our generator is running the lifts, water pumps and stair lights. We'll update you as soon as we hear from the utility." |
| "Why is my flat off but the lift works?" | "The generator powers safety systems and shared services, not the flats. Your power returns when the supply does." |
| "Someone is stuck in the lift" | "Tell them to press the alarm button. We're calling the lift company now." (see the lift checklist) |
| "The generator is very loud / smoky" | "Thanks, we're checking it now and calling the contractor." |
If a resident reports smoke from the generator room, treat it as urgent: UnitVO's urgent path alerts the duty manager at once and shows the local emergency numbers.
Budgeting time
Your weekly check is 10 to 15 minutes. The bigger cost is the contract: compare the contractor's response time during a cut with what the contract says, using your own log.
The mistakes that cost the most
- Nobody knows what's on the generator. Residents get angry when the answer changes every cut.
- Fuel not checked after a long cut. The next cut finds the tank empty.
- The service date slips. Put it in the record, not in someone's head.
When this is not for you
If your building has no generator, skip this, but keep a power-cut reply ready. If the generator is run by a facilities company with its own monitoring, keep their reports. Contractor quotes for big generator repairs can go to the owner for approval: see quotes and owner reports. Also read who UnitVO is not for.
Questions and answers
How often should a building generator run for a test?
Many contracts set a monthly test run and a periodic test on load. Follow your contractor and your authority's rules.
Can our staff service the generator?
No. Oil, filters, batteries, fuel and the changeover switch belong to the generator contractor and a licensed electrician. Your team reads, logs and keeps the room clear.
Why did the generator run but the building stayed dark?
Often a fault in the changeover switch or the wiring to it. That is a job for the licensed electrician.
Can the generator check be part of the weekly round?
Yes, with a photo of the panel and fuel gauge required. See pricing.