International·USD
English
Start free

6 min read · 2026-11-11

The spare parts every residential building should keep

A starter spare parts list for towers and compounds in the Gulf and Egypt: the items that stop small faults becoming second visits, and how to size stock.

Keep in the building the cheap, common parts that cause most second visits: AC filters and drain tablets, tap washers and cartridges, flush valves, fuses and breakers, lamps, door closers and lock cylinders, sealant, and a few hoses and fittings. Size the stock from your own jobs: how often each part was used last quarter and how long the supplier takes to deliver.

Why a small store pays for itself

A technician who finds the fault but has to go and buy a washer turns one visit into two, and the resident's morning into a day. In summer, waiting for an AC part can leave a flat without cooling. A shelf of common parts, kept in the building or on the van, removes the most common reason a job is paused.

Ten groups to start with

Adapt the list to your building's fittings: the brands and sizes in your flats decide the exact part.

GroupTypical itemsWhy
ACFilters in the sizes you have, drain tablets, drain hose, condensate pump for the common model, remote batteriesSummer leaks and "not cooling" start here
Taps and mixersWashers, O-rings, cartridges for the installed mixer models, aeratorsDripping taps are the most frequent small job
ToiletsFlush valves, fill valves, seat fixings, flexible connectorsA broken flush is a high-priority job in a one-toilet flat
DrainsBottle traps, waste fittings, a drain auger, enzyme cleanerSlow drains become leaks if they wait
Water heatersThermostat and element for the common model, safety valveNo hot water is a quick fix if the part is there
ElectricalFuses, breakers matching your boards, sockets, switches, plugsOnly for qualified staff; licensed work stays with licensed people
LightingLamps for flats and common areas, emergency light batteriesDark stairwells are a safety issue
Doors and locksLock cylinders, door closers, hinges, handles, spare keys blanks if you cut themLock faults are access and security problems
Sealants and fixingsSilicone, grout, wall plugs, screws, cable ties, tapeFinish jobs properly the first time
Pumps and tanksSeals and pressure switch for the booster pump, float valveA pump fault affects every flat

Some items (gas parts, lift parts, fire system parts) should only be held and fitted by the licensed contractor responsible for them. Check your contracts and local rules.

How much of each part to keep

A simple rule you can work out on a phone:

  1. Usage: how many of that part were used in the last 90 days.
  2. Lead time: how many days the supplier takes to deliver.
  3. Minimum stock: daily usage times lead time, plus a safety margin (for example one extra week in summer for AC parts; the Gulf summer maintenance calendar shows when to stock up).

Example (made-up numbers): 30 AC filters used in 90 days is one every three days. With a 6-day delivery, keep at least 2, plus a week's margin of 2 or 3: reorder when you reach 5.

Track the parts on the job

The usage numbers only exist if parts are written down when they are used. In UnitVO's technician app, the technician notes the parts used from the van on the job, with before and after photos, and a job waiting for a part can be paused so the time stops counting. That makes "paused: waiting for part" visible, and it shows which parts you should have had. Fewer pauses also change how many jobs a technician can do in a day.

Parts are also filed against the machine in the equipment register: the last five jobs on an AC or pump show what was fitted, and a third repair on the same machine within 60 days is flagged. If the same unit eats a part every month, stocking more is the wrong answer; look at the machine. See repeat repairs.

UnitVO is not a stock control system: it records parts used on each job, but it does not count your shelves or reorder parts for you. Many teams keep the shelf count in a simple sheet and take the usage from the jobs; UnitVO vs spreadsheets explains where a sheet still fits.

A monthly store check

  • Count each group against the minimum.
  • Remove parts for fittings you no longer have.
  • Check expiry on sealants and batteries.
  • Note any part a technician had to buy on the day.
  • Keep the store locked, with one person responsible for the key.

When this is not for you

If your maintenance is run by a contractor who brings their own stock, ask them for their parts list for your building instead. If you need full warehouse stock control with reorder points and purchase orders, use a stock tool alongside; UnitVO does not do that. Read who UnitVO is not for.

What it costs

Every plan has every feature, including the technician app and equipment register. In the International region: Free (5 units, USD 0), Pro USD 49, Team USD 75 and Portfolio USD 199 a month, billed yearly. Each region has its own price list in its own currency; prices are before tax, and UAE customers pay 5 % VAT at checkout. The 30-day trial has Team features for up to 50 units and needs no card. See pricing.

Questions and answers

What spare parts should a building always have?

AC filters and drain tablets, tap washers and cartridges, toilet valves, fuses and breakers, lamps, lock cylinders and closers, sealants and fixings, and pump seals.

How do I know how many to keep?

Take your usage over the last 90 days and the supplier's delivery time, and keep enough to cover the delivery time plus a margin.

Does UnitVO manage stock?

No. It records the parts used on each job and against each machine; the shelf count and reordering stay with you.

Should technicians fit electrical or gas parts?

Only qualified people, and licensed work such as gas, lifts and fire systems stays with the licensed contractor your local rules name.

Add UnitVO as a preferred source on Google

All guides