6 min read · 2026-11-11
How to brief an outside contractor so the job is done once
A contractor brief template for building and holiday home managers: fault, access, photos, scope, limit and proof, so the job is done on the first visit.
A contractor comes back a second time for one of four reasons: they did not know what the fault was, they could not get in, they brought the wrong part, or nobody agreed what "done" looks like. A one-page brief that answers those four before the visit, plus a photo and the machine's last repairs, fixes most second visits; the template below is ready to copy.
What a second visit really costs
The call-out fee is the visible part. The rest is your technician waiting at the door, the resident taking another morning off, the owner asking why the same job appears twice, and a fault that gets worse while it waits. For holiday homes, a second visit can block a turnover. A good brief costs ten minutes; a second visit costs a morning.
The contractor brief template
Copy this into your job, your message or your e-mail.
| Section | What to write | Example |
|---|---|---|
| Place | Building, unit, room, exact spot | Tower A, 402, master bedroom, AC above the wardrobe |
| Fault | What happens, since when, what was tried | Water drips from the indoor unit since Sunday; drain line cleared once on 3 Oct |
| Photos | The fault, the model plate, the access route | Three photos attached |
| Machine history | Last repairs on this machine | 12 Sep drain pan replaced; 3 Oct filter cleaned |
| Access | Who opens, when, any rules | Resident home until 23:00; ask the guard for the service lift |
| Scope | What you want, and what you do not | Find the cause and fix the leak; do not replace the unit without approval |
| Limit | Spending they may go ahead with | Up to the agreed limit; above it, send a quote first |
| Done means | What proves the job is finished | After photo, dry tray, unit running 15 minutes, resident confirms |
| Paperwork | Quote, invoice, warranty | Quote before work above the limit; invoice on the job |
Five rules that prevent the second visit
- Send the model plate. A photo of the label saves the wrong part more often than any description.
- Give the history, not just the fault. "Third leak in two months" tells a good contractor to look for the cause, not just clear the drain again.
- Book access with the resident, not around them. Put the visit window in the brief and confirm it the day before; access rules for occupied flats covers the rest.
- Agree a limit in writing. Without one, the contractor either stops and waits for approval, or goes ahead and you argue later.
- Define done before they start. An after photo and the resident's confirmation are cheaper than a dispute.
How UnitVO handles contractors
In UnitVO, a contractor does not need an account or a seat. You send them a secure link for one job, where they enter the amount and upload a quote or an invoice. The quote lands on the job, next to the unit, the fault and the photos. If it is above the spending limit you set for that property, it waits for the owner, who approves or declines in one tap; the decision and its time are kept in the audit log. See contractor quotes and owner approvals.
The machine history comes from the equipment register: register the AC or pump once with its model and warranty date, stick its QR code on it, and the last five jobs are one scan away. A third repair on the same machine within 60 days is flagged, and the warranty date is right there, so you can ask whether the supplier should pay before you call the contractor at all (equipment warranty tracking explains how).
When nobody on shift holds the skill, dispatch shows it and you send a contractor a link for that job instead. UnitVO does not pay contractors: the quote, the decision and the invoice stay together, and the payment goes through your own bank or accounts.
A checklist before you press send
- Is the exact place written, not just the unit number?
- Is there a photo of the fault and of the model plate?
- Did you add the last repairs on this machine?
- Is the access window agreed with the resident?
- Is the scope clear, including what not to do?
- Is the spending limit written?
- Does the contractor know what proof you need?
When this is not for you
If your contractors work under a long-term maintenance contract with their own job system, keep the brief as the content of your request to them; you may not need another tool. If your owners want to approve quotes through WhatsApp messages, note that WhatsApp on your own number is being connected in UnitVO; today they approve from the link. Read who UnitVO is not for, and if your contractor requests live in a sheet, see UnitVO vs spreadsheets.
What it costs
Contractor links and owners are free on every plan. In the International region: Free (5 units, USD 0), Pro USD 49, Team USD 75 and Portfolio USD 199 a month, billed yearly. Each region has its own price list in its own currency; prices are before tax, and UAE customers pay 5 % VAT at checkout. The 30-day trial has Team features for up to 50 units and needs no card. See pricing.
Questions and answers
What should a contractor brief include?
The exact place, the fault and its history, photos including the model plate, the access window, the scope, the spending limit and what proves the job is done.
Does the contractor need a UnitVO account?
No. They get a secure link for one job to upload a quote or an invoice, with no account and no seat.
What if the quote is above the owner's limit?
It waits for the owner, who approves or declines in one tap, and the decision is recorded with the job.
Can UnitVO pay the contractor?
No. It keeps the quote, the decision and the invoice together; you pay through your own bank or accounts.